Infrastructure
AVE Almeria project advances with €5M track equipment contract
Published October 16, 2025 | Category: Infrastructure
TL;DR: A new €5 million contract strengthens the AVE Almeria high-speed train works, focusing on advanced track expansion systems for the Vera–Almeria section.
AVE Almeria project advances with €5M track equipment contract
The ongoing construction of the AVE Almeria high-speed railway has received another financial boost. Adif, Spain’s railway infrastructure manager, has awarded a €5.1 million contract for the delivery and installation of expansion systems designed to improve the stability and performance of the new track between Vera and Almeria.
The equipment includes several types of high-speed expansion devices, ballast walls, anchors and walkways required to prepare the section for speeds of up to 350 km/h. These systems are crucial to ensure smooth operation under extreme temperature variations and heavy traffic loads, and are expected to last more than 30 years.
The new contract, awarded to an engineering firm specialized in high-speed rail systems, will be carried out over a 16-month period, with completion scheduled between 2026 and 2027. It forms part of Adif’s broader goal to advance the Mediterranean Corridor and connect Almeria with Murcia and the national high-speed rail network.
At the same time, Adif has initiated the tender process for the electrification phase, including the installation and maintenance of the overhead catenary systems across 140 kilometres of track. This phase represents a major step toward full electrification of the corridor linking Murcia and Almeria.
The AVE Almeria project is now more than halfway complete, with progress continuing steadily despite the complex terrain and technical challenges. The works on the Vera–Almería stretch remain one of the most advanced sections of the entire route.
For background and detailed progress figures, read our full report: AVE Almeria 2025: €8.2 M Boost Drives High-Speed Train Progress to 67%.
Official contracting notices can be found on the Adif official tenders page.
For more updates from across the province, visit our Infrastructure category.
Infrastructure
AVE High-Speed Rail to Almeria Passes 50% Completion Ahead of 2026 Deadline
Published September 22, 2025 | Category: Infrastructure, Real Estate & Economy
TL;DR: The AVE Almeria high speed rail is now more than 50% complete, with full service expected by October 2026. This milestone promises to transform transport links, tourism and property investment across the province.
AVE Almeria High Speed Rail: Over 50% Complete Ahead of 2026 Opening
Construction Progress and Current Status
The AVE Almeria high speed rail has reached a decisive milestone. According to Spain’s Ministry of Transport and local reports, more than 50% of the construction work is now complete. Tunnels, viaducts and track sections are progressing simultaneously, with several phases already nearing finalization. The integration of the line into Almeria’s main station is considered one of the most technically demanding parts of the project, but officials confirm that works are advancing as scheduled.
Timeline and Opening Date
Authorities have set a clear target: the AVE Almeria high speed rail should be fully operational by October 2026. This schedule would finally connect Almeria to Spain’s wider high-speed rail network, reducing travel times to Madrid to under three hours. Previous infrastructure projects in Andalusia have experienced delays, but in this case funding, planning and execution are aligned to deliver on time. The milestone of 50% completion reinforces confidence that the deadline can be achieved.
How the AVE Will Transform Transport
Once inaugurated, the AVE Almeria high speed rail will reshape mobility across the province. Residents will benefit from faster, more reliable connections to other Andalusian cities such as Granada, Malaga and Seville, while long-distance travelers will find Almeria far more accessible. For tourists, shorter travel times will make the province a stronger competitor to coastal destinations already served by the AVE. Local businesses also expect an increase in conference tourism and day trips, supported by the improved connectivity.
Impact on Real Estate and Economy
Infrastructure projects of this scale typically generate a ripple effect in the property market. Analysts predict that the AVE Almeria high speed rail will drive demand for both residential and commercial property, especially in areas close to the main station and along connected corridors. Investors see the project as a catalyst for economic activity, with opportunities in tourism, hospitality, retail and services. Similar projects in other Spanish provinces have demonstrated clear links between high-speed rail and rising property values.
For more insights into housing trends and investment opportunities, visit our Real Estate & Economy section.
Local Perspectives and Challenges
Despite optimism, the project is not without challenges. Construction has disrupted traffic in parts of Almeria city, and some residents have voiced concerns about noise and integration with existing public transport. Environmental groups are monitoring the impact of tunnels and bridges on local landscapes and ecosystems. However, municipal leaders emphasize that the long-term benefits outweigh short-term inconveniences. Reinforced coordination between city transport systems and the new AVE station will be crucial to maximize its positive impact.
Outlook for Almeria Province
With the works now more than halfway finished, the AVE Almeria high speed rail is no longer a distant promise but a tangible reality. Its completion in 2026 will mark a turning point for the province, improving mobility, strengthening the economy and enhancing Almeria’s visibility as a destination for both tourists and investors. The combination of faster travel times, stronger infrastructure and new opportunities for growth positions the province for a new era of development.
For ongoing coverage of major transport projects, visit our Infrastructure category. To understand how these investments influence property values and investment trends, explore our Real Estate & Economy category.
Infrastructure
Municipal upgrades in San Juan de los Terreros
Published June 27, 2025 | Category: Latest News
The Town Council of Pulpí has announced a new phase of upgrades in San Juan de los Terreros, including renovations to key municipal buildings and services.
San Juan de los Terreros Begins Upgrades to Municipal Facilities
The local government of Pulpí has launched a project to remodel and enhance several municipal buildings in San Juan de los Terreros. The upgrades aim to improve public services and visitor information in the coastal town, which continues to grow in popularity as a summer destination.
Work is already underway to renovate tourist information offices, improve administrative spaces, and update technical facilities that serve both residents and seasonal visitors. The project is part of a wider plan to modernise essential infrastructure and improve accessibility across the municipality.
According to the council, the updates will help improve service efficiency, comfort, and long-term functionality — aligning with the area’s tourism strategy and growing year-round population.
These developments follow recent investments in sport and culture, including a new padel court and upgraded access roads.
For more updates from across the province, visit our Latest News section.
- Events1 month ago
Almería Western Film Festival 2025: Honoring Charo López, Roque Baños and More
- Activities & Attractions1 month ago
Night of the Candles in Mojácar: village aglow on September 20
- Activities & Attractions4 weeks ago
Almería Cultural Agenda: Best Events This September & October 2025
- Infrastructure3 weeks ago
AVE High-Speed Rail to Almeria Passes 50% Completion Ahead of 2026 Deadline