Infrastructure
Almeria Approves €400,000 Contract to Upgrade Cycling Lanes
Published November 19, 2025 | Category: Infrastructure
TL;DR: The Almería City Council has approved a €400,000 contract to improve and maintain the city’s cycling lanes, including resurfacing, signage upgrades and safety enhancements.
Almería approves €400,000 contract to upgrade and maintain the city’s cycling lanes
The Almería City Council has approved a new €400,000 investment aimed at improving and maintaining the municipality’s cycling lane network. The contract, authorised in a recent meeting of the Junta de Gobierno Local, includes resurfacing works, new signage and safety enhancements along key sections of the city’s existing carriles bici.
According to the local administration, the goal of the project is to extend the lifespan of the current infrastructure, improve comfort and visibility for cyclists, and ensure safer mobility across the city. The works will be carried out between 2025 and 2027, prioritising areas with higher traffic flow and sections where surface wear or outdated signage has been reported.
The plan is part of the municipality’s wider strategy to promote sustainable mobility, encourage everyday cycling and support cleaner transport alternatives within the urban area.
For more updates from across the province, visit our Infrastructure category.
Infrastructure
Junta Reinforces Slope Next to A-1207 Cycle Path in Vera
Published November 28, 2025 | Category: Infrastructure
TL;DR: The Junta de Andalucía is reinforcing a slope next to the A-1207 cycle path in Vera to prevent further landslides and improve safety for pedestrians and cyclists.
Junta Reinforces Slope Next to A-1207 Cycle Path in Vera
The Junta de Andalucía has started works to stabilise the slope next to the cycle and pedestrian path along the A-1207 in Vera. The intervention aims to resolve recent small landslides caused by erosion and weather, which had begun to affect the pavement and a busy cycling route.
The works cover the section between kilometre points 0.37 and 0.66 of the road and are funded with more than €48,000. During a visit to the site, the territorial delegate for Public Works and the mayor of Vera reviewed the progress of the project, which is being carried out under the supervision of the regional roads department.
The solution includes installing a prefabricated reinforced-concrete wall parallel to the cycle path. This structure is designed to protect users, stabilise the slope and improve the visual integration of the area. The route is heavily used throughout the year by residents, commuters and cyclists, making the reinforcement an important investment in local safety and infrastructure.
For more infrastructure updates across the province, visit our Infrastructure section.
Infrastructure
Port of Almeria to Renovate Maritime Station and Modernise Its Architectural Image
Published November 28, 2025 | Category: Infrastructure
TL;DR: The Port of Almeria has launched a comprehensive renovation of its maritime station and surrounding buildings. The project aims to modernise the terminal’s architecture, improve energy efficiency and reduce emissions, with works now entering the design and planning phase.
Port of Almeria to Renovate and Modernise
The Port of Almeria is preparing for a significant transformation. The Autoridad Portuaria de Almería (APA) has initiated a major renovation project for the maritime station and several nearby service buildings, marking an important step within its 2024–2030 Sustainability Strategy, as reported by APA’s official communication channels.
The plan focuses on improving both the architectural appearance and the energy performance of key structures in the passenger terminal area. The initiative aims to reduce the port’s primary non-renewable energy use by at least 30%, lowering emissions and improving thermal insulation while modernising the visual identity of the port’s waterfront.
Port of Almeria Renovation of Four Key Buildings
The renovation project will encompass four structures: the main Maritime Station (8,244 m²), the “Servicios Múltiples” building (647 m²), and two smaller annex buildings used for port services. The goal is to give the area a cleaner, more contemporary architectural look while bringing the buildings up to current environmental standards.
According to APA, the refurbishment will enhance passenger comfort, improve natural lighting, optimise internal layouts and support the move toward a more environmentally responsible port operation.
Tendering Process Underway
The Port Authority has begun the tendering process to develop the full renovation project, including architectural plans, technical documentation, safety planning and construction management. The project carries a base budget of €359,975 (including VAT), with a three-month period allocated for technical drafting and one year for execution oversight.
Companies interested in bidding can attend an official technical site visit scheduled for 4 December, where APA will offer on-site explanations of the buildings to be remodelled.
Part of a Wider Sustainability Push
This renovation fits within a broader shift toward sustainability across the province. Beyond the port, Almeria is seeing progress in areas such as circular economy and emissions reduction — including innovative projects that turn plastic waste into biodiesel. Together, these initiatives reflect a coordinated effort to modernise infrastructure while moving toward a more efficient and environmentally conscious future.
A New Look for the Port–City Interface
The Port Authority emphasises that the architectural improvement of the Maritime Station is not only a functional upgrade but also an opportunity to strengthen the visual harmony between the port and the city of Almeria. By updating façades, improving exterior finishes and enhancing the immediate surroundings, APA hopes to create a more welcoming entrance for ferry passengers and a more attractive urban waterfront.
The project marks the beginning of a wider effort to reposition the port as a modern, efficient and sustainable transportation hub — one that better serves residents, tourists and international travellers.
For more infrastructure updates across the province, visit our Infrastructure section.
Infrastructure
Murcia–Almería High-Speed Rail: €9.6 Million in New Funding
Published November 27, 2025 | Category: Infrastructure
TL;DR: Spain has approved €9.6 million in new supply contracts for the Murcia–Almería High-Speed Rail, supporting progress on the Lorca–Vera and Vera–Almería sections as the corridor moves toward full assembly and electrification.
Murcia–Almería High-Speed Rail: Progress, Funding and Next Steps
The Murcia–Almería High-Speed Rail has received a new funding package worth €9.6 million from Spain’s Ministry of Transport and Sustainable Mobility, managed through Adif Alta Velocidad. The contracts focus on supplying essential technical components required for the next stage of track assembly.
Of this amount, €5.3 million is dedicated to advanced turnouts for the Vera–Almería section. These systems allow high-speed trains to safely change tracks and are crucial for finalizing the alignment.
A further €4.3 million is assigned to expansion joints for the Lorca–Vera segment. These devices absorb rail movement caused by temperature changes, ensuring long-term structural integrity and safety.
The investment adds to previous contracts for sleepers, rail sections, drainage systems and safety equipment, forming a comprehensive package that transitions the corridor into its technical phase.
Construction progress across the Murcia–Almería High-Speed Rail corridor
Work along the nearly 200 km Murcia–Almería corridor is now entering a coordinated phase of track installation, electrification and systems integration. Platform construction is largely completed, opening the way for full assembly.
On the Murcia–Lorca stretch, track laying is already underway, supported by ongoing electrification works that include catenary supports, power-supply structures and transformer installations.
The Lorca–Vera section is preparing for its final assembly phase. Deliveries of sleepers, fastening systems and structural components are ongoing, while contractors finalize tender procedures for on-site assembly.
Between Vera and Almería, construction teams are installing materials previously contracted, including rails, sleepers and turnout systems. This section includes multiple viaducts, access zones and tunnel approaches, all requiring precise coordination.
Across the entire route, progress continues on ERTMS signalling, fibre-optic communication networks, noise protection barriers and energy substations — all of which must be in place before test runs begin.
Technical specifications and engineering highlights
The high-speed line is designed for operations up to 300 km/h, using double standard-gauge track. In select sections, it runs parallel to Iberian-gauge freight lines, allowing simultaneous passenger and logistics use.
Major engineering structures include long tunnels, multi-span viaducts and complex cut-and-cover works. One of the most distinctive achievements is the completed Viaduct of the Ugly Ones, marking a major structural milestone on the Almería side.
Other technical elements include reinforced retaining walls, advanced drainage systems, anti-vibration slabs and concrete structures designed to withstand high-speed dynamic loads.
Urban integration and station connections
At both the Murcia and Almería ends of the corridor, urban integration works play a major role. The transformation of Almería’s rail access — including its underground connection — is coordinated with the high-speed project and managed jointly by Adif and the Ministry of Transport and Sustainable Mobility.
In Almería city, tunnel entrances, ventilation systems and safety corridors are being prepared to interface with the new underground alignment. Once complete, the connection will link directly with the future intermodal station.
Regional benefits: faster mobility and stronger links
The new corridor will significantly improve long-distance travel for Almería Province. Shorter travel times to Murcia, Alicante, Valencia, Catalonia and Madrid will reshape travel patterns for both residents and businesses.
For Vera, the future high-speed station will create a direct link between inland towns and major destinations across eastern Spain. Improved accessibility is expected to boost year-round tourism in areas such as Vera Playa, Garrucha and Mojácar.
Students, workers, medical travellers and seasonal visitors will benefit from faster, more predictable transport options that reduce dependence on long road journeys.
Economic and territorial impact
Infrastructure projects of this scale often stimulate investment around station areas. As the Murcia–Almería corridor advances, interest is already increasing in residential and commercial development near key nodes.
Almería’s agricultural sector stands to gain from improved logistics, as faster freight connections help reduce distribution times to national and European markets.
Local governments also anticipate improvements in public transport integration, road access, and urban renewal tied to the arrival of high-speed services.
Outlook and next steps
With new contracts activated for turnouts, expansion joints, electrification components and signalling systems, the Murcia–Almería corridor is moving decisively toward its final phase. The next stages include full track assembly, systems testing and certification.
Although specific operational dates may shift as work progresses, current indicators show stable momentum toward fully incorporating Almería into Spain’s high-speed rail network.
For official updates, progress documents and technical reports, visit Adif Alta Velocidad and the Ministry of Transport and Sustainable Mobility.
For more updates from across the province, visit our Infrastructure category.
Almeria News
El Ejido strengthens electrical infrastructure with €700,000 investment
Published November 13, 2025 | Category: Infrastructure
TL;DR: El Ejido has approved a €700,000 investment to modernise its medium-tension electrical grid, strengthening supply for agricultural zones and local communities in the Poniente region. Almeria news
El Ejido invests €700,000 in electrical infrastructure upgrade
The municipality of El Ejido in the Poniente region of Almeria has announced a major infrastructure upgrade aimed at improving the local medium-tension electrical grid. A total of €700,000 has been allocated to enhance supply reliability across key agricultural areas, according to official information released by regional authorities.
The plan includes the installation of a new medium-tension cell at the Cumbres sub-station and upgrades to feeder lines supplying Las Norias de Daza and Balsa del Sapo — two areas known for intensive agricultural activity and irrigation systems that place high demand on the electrical grid.
Full details can be found in the official communication published via Europa Press.
Scope of the project and beneficiaries
Of the total investment, around €100,000 targets improvements at the sub-station, while the remaining €600,000 covers upgrades to the wider distribution network. These works aim to stabilise electrical supply for both residents and the highly productive agricultural sector — a key economic pillar of the Poniente region.
Local representatives explain that these upgrades will reduce service interruptions, support energy-intensive greenhouse operations, and improve long-term resilience across the municipality.
Importance for the Poniente region
This project demonstrates ongoing public investment in the Poniente of Almeria, an area that often receives less English-language media coverage despite being one of the province’s strongest economic engines. Strengthening infrastructure in El Ejido supports agricultural output, commercial activity, and long-term residential growth.
Timeline and next steps
The works are expected to continue for approximately 18 months, with completion anticipated around mid-2026. After the construction phase, the project will undergo testing, safety checks, and system integration before the upgraded grid becomes fully operational.
Once completed, the improved grid will deliver greater reliability and capacity — directly benefiting businesses, the agricultural sector, and the general public.
For more updates across the province, visit our Infrastructure category.
-
Infrastructure3 days agoMurcia–Almería High-Speed Rail: €9.6 Million in New Funding
-
Travel Tips5 days agoTabernas Officially Named One Of Spain’s New Magical Towns
-
Events3 days agoMojácar Christmas 2025: Disney Day & Official Lights Switch-On
-
Events2 days agoTerreros Slalom 2025: 35 Drivers Compete in a Key Andalusian Championship Round
-
Community2 days agoDisney in Almeria: The Forgotten Story of the Park That Almost Happened
-
Expats & Living3 days agoEmbargos Bestiales Antas – Affordable Furniture and Home Goods in Almería
