Connect with us

Infrastructure

Full Road Access Restored Around Torrecardenas Shopping Centre After Years of Disruption

Published 15 June 2026 | Infrastructure

TL;DR: The completion of roadworks around Torrecardenas Shopping Centre has restored full traffic flow, reopening all access routes and significantly easing congestion in the area.

Full Road Access Restored Around Torrecardenas Shopping Centre After Years of Disruption

Traffic Flow Returns to Normal After Long-Term Construction

For local drivers and visitors alike, the streets surrounding Torrecardenas Shopping Centre have returned to smooth, unrestricted traffic. Since 2018, ongoing works linked to the Pipa Alta water reservoir project caused considerable disruption, limiting access and triggering legal challenges. Now, with all roads fully reopened, the area is once again accessible without delays or detours. This marks a significant milestone for residents and shoppers who rely on multiple routes into and out of the commercial hub.

Key Routes Including Avenida de Torrecardenas and Avenida de la Constitucion de Cadiz Fully Reopened

The reopening includes two lanes on Avenida de Torrecardenas, the adjacent service road heading uphill, and two lanes in each direction on Avenida de la Constitucion de Cadiz. These improvements alleviate some of the worst congestion previously experienced at the main roundabout above the shopping centre. Over recent months, most traffic had been diverted through Médico Francisco Pérez Company street, creating bottlenecks and inconveniences. Now the restored access network provides more direct and efficient routes for everyone driving into the area.

Enhanced Connectivity Benefits Visitors and Staff

Owned by LightHouse Properties and managed by Multi Iberia, the shopping centre’s management underscores the importance of complete access for both customers and employees. With the full infrastructure operational again, visits become more straightforward and convenient. This restored connectivity is expected to improve the overall experience, encouraging more smooth and flexible travel options from different parts of Almeria city.

Local Government Efforts Drive Traffic Improvements

The City Council of Almeria played a key role in pushing forward and finalizing these road works. Their efforts not only restored existing infrastructure but also enhanced it, creating better traffic conditions around the shopping centre environment. This renovation supports the future growth and development of the area, positioning Torrecardenas Shopping Centre as an even more accessible destination. The reopening of Avenida de la Constitucion de Cadiz, particularly, has been vital in re-establishing the traffic flow patterns that existed before the lengthy construction period.

A Positive Outlook for the Area’s Mobility

With all major access points now open, the traffic situation around the Torrecardenas complex has normalized and improved. The shopping centre management celebrates this step forward, viewing it as a boost not only for daily commuters but also for the wider community that benefits from the area’s connectivity. Moving ahead, these improvements lay a solid foundation for accommodating growing visitor numbers and supporting local commerce without the previous restrictions that held back smooth movement.


For transport projects, public works and major development updates across the province, explore our latest Infrastructure coverage.

Infrastructure

Alvores Proposes New Uses for Almeria Nautical Activities Centre

Alvores Developments seeks approval to transform Almeria Nautical Activities Centre into a multifunctional hub with offices, culture, logistics.

Centro de Actividades Náuticas building at Port of Almería in natural Mediterranean light at sunset

Published 18 July 2026 | Infrastructure

TL;DR: Alvores Developments requests official approval to change and expand the use of the long-closed Centro de Actividades Náuticas building in the Port of Almería for administrative, cultural, logistical, and dining purposes.

Plans to Revamp Almeria Nautical Centre

Request to Alter Building Use

Alvores Developments S.L., the company granted administrative concession of the Centro de Actividades Náuticas building in the Port of Almería in August 2025, has formally requested a substantial modification of its agreement. The firm proposes to repurpose the current facility, which has remained closed for years, shifting its function from a purely nautical activities centre to a versatile space accommodating offices, cultural exhibitions, logistics, and restaurants.

Expansion and Extension Plans

The application submitted calls not only for a change in use but also an increase in the building’s constructed area and the adjoining terrace space. Furthermore, Alvores is asking for an extension of the concession’s duration beyond the original 20-year term granted, with all other key conditions of the concession remaining unchanged. These adjustments aim to better adapt the facility to the new multifunctional concept envisioned by the company.

Public Consultation Process Underway

Following the request, the Port Authority of Almería has published details in the Boletín Oficial del Estado (BOE) to open the plan for public scrutiny. Interested parties have twenty working days from the BOE publication on 17 July 2026 to review the related documentation at the Port Authority offices on Muelle de Levante during regular business hours. They may submit any relevant observations or objections electronically through the Authority’s official online portal.

Background and Future Potential

The Centro de Actividades Náuticas has been out of operation since the regional government of Andalusia vacated the premises several years ago. The original concession included a 20-year usage term with the possibility of renewal. Alvores’ proposed redevelopment intends to give new life to the building by establishing its headquarters there alongside spaces for business activities, cultural events, dining options, and shared services. The proposed changes seek to reintegrate the site as a vibrant hub within the port area, reflecting current urban and commercial dynamics.

Ports Authority Statement

The Port Authority of Almería has confirmed the start of this modification process as a necessary administrative step following the filing of Alvores’ application but has not released detailed information regarding the specifics of the planned changes. The outcome of this public information phase will influence the final decision on the concession’s reconfiguration and future use.


For transport projects, public works and major development updates across the province, explore our latest Infrastructure coverage.

Continue Reading

Infrastructure

San Miguel CPR in Pulpi to Get Major Expansion and Renovation

San Miguel CPR in Pulpi will undergo a major expansion and renovation to add classrooms, a gym, and modern facilities for 225 students, funded.

San Miguel CPR Pulpi school with existing building and new expansion construction site under Mediterranean sun

Published 17 July 2026 | Infrastructure

TL;DR: The San Miguel CPR in Pulpí will undergo a major expansion and refurbishment, adding new classrooms, a gym, and modern facilities to support 225 students, funded partly by the European FEDER program.

Pulpi School Expansion and Upgrades

Scope of the Project

The Andalusian Ministry of Education, through its Public Agency of Education, has awarded a contract for the extension and renovation of the Colegio Público Rural (CPR) San Miguel de San Juan de los Terreros in Pulpí, Almeria. The project, valued at nearly €2.84 million and set to be completed within a year, will significantly upgrade the school’s infrastructure and capacity.

New Facilities and Layout

The renovation will transform the school into a type C1 centre with one class line for both early childhood and primary education, accommodating up to 225 pupils. This increase in capacity will allow for the removal of an existing modular unit with two prefabricated classrooms previously used to handle demand.

The extension involves both new construction and internal refurbishment. The school’s footprint will expand onto an adjacent plot, bringing the total site area to just over 5,100 square meters. On the west side of the current building, a new gymnasium with changing rooms and storage will be built. Meanwhile, the south side will host a new two-story building featuring multiple classrooms and communal spaces.

The ground floor of this new building will cater to the youngest students with three versatile classrooms for infants, along with outdoor learning areas, a dining room, and kitchen facilities. The upper floor will provide six adaptable classrooms for primary education plus a workshop room designated for music activities, creating nearly 1,830 square meters of additional constructed space.

Upgrading Existing Structures

Alongside the new buildings, the original school structure will be extensively refurbished. Interior walls will be reconfigured to optimise space distribution. Sanitary facilities will be modernised, electrical systems brought up to current regulations, damaged louvres replaced, and access to the sports court improved.

This original section will house common and administrative areas such as the head teacher’s office, administrative offices, staff room, parent and student association rooms, a library, resource room, IT suite, and maintenance facilities.

Outdoor and Energy Features

Outside, the campus will be arranged with separate playgrounds tailored for infant and primary students, enhancing safety and play opportunities.

Energy efficiency is a key element of the upgrade. The school will be equipped with a bioclimatic system using adiabatic cooling powered by photovoltaic solar energy, combined with aerothermal heating technology. This approach aligns with contemporary sustainability standards.

Funding and Strategic Significance

This project is part of the Andalusian Ministry of Education’s wider Infrastructure Plan, executed by the Public Agency of Education. It receives co-financing from the European Regional Development Fund (FEDER) under the 2021-2027 programme, showing a commitment to improving educational environments with European support.

With these improvements, San Miguel CPR will offer a modern, spacious, and environmentally conscious setting designed to meet the educational needs of the Pulpí community well into the future.


For transport projects, public works and major development updates across the province, explore our latest Infrastructure coverage.

Continue Reading

Infrastructure

Twenty Companies Compete to Build Vera High-Speed Train Station

Twenty companies have bid to build Vera’s high-speed rail station, with construction set to start by late 2026 and finish by mid-2028.

View of Vera town and A-352 road near future high-speed train station site in natural Mediterranean light

Published 16 July 2026 | Infrastructure

TL;DR: Twenty companies have submitted bids to build Vera’s new high-speed rail station, with construction expected to start by the end of 2026 and finish by mid-2028.

Vera High-Speed Rail Station Project

Competitive Bidding Process

The project to build the Vera-Almanzora high-speed rail station has attracted significant interest, with 20 companies and temporary joint ventures putting forward proposals by the May 28 deadline. Adif, the Spanish railway infrastructure manager, has already begun evaluating the offers to select a contractor. The economic bids range from a low of 13.77 million euros, submitted by the multinational ASCH Infraestructuras y Servicios (successor to Assignia), to a high of 15.50 million euros, offered by Sacyr Construccion. A tender evaluation committee met virtually on July 1 to analyze the financial proposals, and the result will now be forwarded to Adif’s contracting authority for the formal award decision. At this stage, no winner has been announced publicly.

Project Scope and Timeline

The winning contractor will be responsible for completing the station within an 18-month period, roughly a year and a half. If the timeline proceeds without setbacks, construction should commence before the end of 2026 and wrap up by mid-2028. The project entails building a new passenger station spanning approximately 1,850 square meters, including the main building, platforms, parking facilities, and roadway access from the nearby A-352 road linking Vera and Garrucha.

Station Design and Facilities

The Vera-Almanzora station will be situated just south of the historic town center, positioned between the town and the coastal beach area adjacent to the A-352 road. The station building will include a spacious central hall with ticket counters and customer service areas catering to several rail operators. Amenities such as restrooms, waiting rooms, offices, storage rooms, and commercial premises will also be incorporated. The building will house control areas for access, communication systems, and connections to the platforms.

Passengers will access the platforms, which are elevated relative to the main concourse, via an underground passage. The four platforms will extend over 450 meters each and will be covered with protective canopies. To facilitate smooth passenger flow, there will be four elevators, four escalators, two fixed stairways, and four emergency staircases linking the concourse with the platforms.

Parking and Access Infrastructure

Outside the station, a parking lot will be constructed with capacity for at least 150 vehicles, expandable to 200 spaces as needed. The project also includes dedicated areas for bus and taxi stops, improving public transport connectivity. A new access road will connect the station with the A-352 at kilometer 8.05, ensuring smooth vehicular entry and exit for passengers using the station.

This development represents an important future transport hub for Vera and the wider Almanzora area, enhancing the region’s integration into Spain’s high-speed rail network and improving access for both residents and visitors.


For transport projects, public works and major development updates across the province, explore our latest Infrastructure coverage.

Continue Reading

Upcoming Local Events

Advertisement

Real Estate & Economy

Towns & Villages

Trending

Sign In

Register

Reset Password

Please enter your username or email address, you will receive a link to create a new password via email.